How Movable Partition Wall Systems Are Prepared
Explore the practical workflow used to coordinate materials, track systems, panels, finishes, hardware and packing around approved project information.
- Opening dimensions and stacking plans
- Track, frame and panel preparation
- Finish and hardware coordination
- Inspection, labeling and protective packing

Start With the Space, Not a Generic Product
The team reviews the opening width and height, application, ceiling support, track route, stacking position, access requirements and preferred finish before production preparation.
Dimensions and configuration remain subject to approved drawings and written project confirmation.
Coordinate Track, Frames and Panel Components
Track sections, aluminum frames, panel materials, seals and operating components are prepared according to the confirmed system configuration.
- Track and carrier matching
- Frame and panel dimension checks
- Surface-finish and accessory coordination


Build Around the Approved Panel Configuration
Panels are assembled with the applicable edges, seals, operating hardware and confirmed decorative surface. Access doors and special components are coordinated where included in the approved scope.
Prepare Components for Clear Project Delivery
Before packing, the team checks visible surfaces, applicable operation, ordered quantities, labels and protection. Packing and documentation are organized for the confirmed delivery scope.
Talk to the Project Team
See the Production Environment
Watch the EBUNGE factory overview and use the enquiry form to discuss the workflow applicable to your project.
